top of page
1 min read
Some Boring House Maintenance
This spring we finally got around to finishing up some outstanding house maintenance projects. The big projects are more fun...
1 min read
2nd Bedroom Doors Galore!
Next up in the 2nd bedroom were the closet doors. Mace ordered the bi-folds months ago and they came in primed but still needed to be...
1 min read
Ceiling Vents
The weekend after we got the 2nd bedroom closet door jamb and trim installed some major visual changes were about to take place. First up...
1 min read
2nd Bedroom Door Jamb & Trim
After the drywall and priming phase it was time to finish off the closet with the door jamb and trim. I got one coat on everything...
1 min read
Closet Primed and Paint Colors
With the framing and drywall finished along with wall touch ups, it was time for me to get in there and start painting! First color up…...
1 min read
2nd Bedroom Closet Drywall
Now that the closet frame was up it was ready for drywall. Here are a bunch of shots as the drywall was going up. A close up of the...
2 min read
Last Wall Papered Room Down!!
Here’s a peak at a current project we’re working on. For the last month we’ve been working on putting a closet back into our 2nd bedroom...
1 min read
Master Bathroom Mini Refresh Part 1
Our master bathroom was in some serious need of attention and Mace had big plans to get it up to snuff before the wedding (which was 5...
1 min read
Our Deck – The Reveal!!!
13 weeks, 92 days, and countless hours of hard, labor intensive work and our deck was finally complete!! So much time and energy went...
3 min read
Our Deck – Lighting, Gate, & Last Details
For extra support Mace added some bracing under the deck. A small thing but you can never have too much stability on a large structure....
2 min read
Hall Bath Wall Repair & Paint
The same week the deck landing and skirt board were being done Mace was also doing some work inside the house so I could keep moving on...
2 min read
Our Deck – The Railings Phase I
Now that we had all the deck boards installed and the deck stairs mostly completed it was time to start on the railings! Mace was...
1 min read
Our Deck – Deck Boards Phase II
Week 8 of deck building was a very exciting one because all the deck boards were down by the end of it!! The planer was still getting a...
3 min read
Our Deck – Stairs & Electrical Phase I
Mace and I were enjoying a glass (or two) of wine last night when Mace spilled some of it on the deck boards. That lead to a...
5 min read
Our Deck – Phase I of Deck Boards
After the structure was up we had a special delivery of our deck material. What the deck was going to be made out of was a big topic of...
2 min read
Hall Bathroom Update
So while the guys were busy outside with the deck, I was tackling my own project inside. Our hallway bathroom was in need of some...
2 min read
Our Deck – The Structure
Now that we had a solid foundation for the deck we could start building the structure. With help on the way Mace started by taking off...
3 min read
Our Deck – The Beginning
As I have mentioned before, one of the main reasons we ended up going with this house was because of the opportunity to put on a deck. ...
2 min read
Put Your Plumbers Hat On!!
Nothing like having a plumbing issue when you’re in the middle of another renovation!! That’s what happened to us during the...
2 min read
Slider Threshold & Floor Patches
While all the other finishing details were happening with the slider we also had to lay new flooring where we removed the baseboard...
Stay In The Know!
Subscribe to our newsletter to receive updates about our latest projects, recent blog posts, and our best design tips!
bottom of page